Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Commissioning - ACO Lipumax-P Gebrauchsanleitung

Vorschau ausblenden Andere Handbücher für Lipumax-P:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Grease separators Lipumax-P -B, -D, -DM, -DA

Operation

4
Operation

4.1 Commissioning

A general inspection by a properly qualified technician is mandatory for the commissioning,
Chap. 1.4 „Personnel qualifications". Scope of the general inspection,
year general inspection".
Individual tasks can be omitted depending on the grease separator version:
HP unit:
Cut off the rubber overhang of the cap
Î
(sealing cover) for the ventilation of the
oil basin.
Check the HP pump oil level, top up with
Î
oil (type SAE 90) if necessary.
Clean the grease separator.
Î
Connect the HP unit to the power supply.
Î
Connect control to the electrical supply and set automatic mode (solenoid valve of the
Î
filling device is automatically opened briefly 2x per day and the odour trap of the filling
pipe is equipped with a water trap,
Open the shut-off valves in the cold water connection pipes of the filling device with
Î
solenoid valve and HP unit.
116/ 144
WARNING
Risk of injuries due to high-pressure inner cleaning
During the cleaning process the raising system (maintenance opening) must
be kept closed.
CAUTION
Risk of infection in case of contact with wastewater
Wear protective equipment,
Chap. 1.5 "Personal protective equipment".
Chap. 4.2.1 „Control".
Chap. 5.4 „5

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für ACO Lipumax-P

Diese Anleitung auch für:

Lipumax-bLipumax-daLipumax-dLipumax-dm

Inhaltsverzeichnis