Herunterladen Diese Seite drucken

GRAUPNER TERRY S Bauanleitung Seite 22

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Install the captive nut (3) using plenty of adhesive. Cut the elevator snake outer
sleeve (6) to a length of 440 mm and glue it in place, pressing it into position with a
screwdriver. Glue it to the side of the spruce fuselage reinforcement (2) at the front.
Cut off a wedge 2 mm wide from the fin (4), and glue the rudder snake outer sleeve
(5) and the horn (9) in place as shown. Glue the snake outer to the appropriate
channel only.
When the adhesive has set hard, glue the rudder snake outer (5) to the underside of
the fin towards the leading edge. Ensure that it ends flush with the fin; it must not foul
the fuselage reinforcement (2), otherwise it will be impossible to install the fin (4) in
the correct position.
The prepared fin can now be trial-fitted in the fuselage; if there is a gap between the
fuselage and the fin, squeeze the top edges of the fuselage together.
GRAUPNER GmbH & Co. KG D-73230 KIRCHHEIM/TECK GERMANY
Änderungen vorbehalten! Keine Haftung für Druckfehler!
Id.-Nr. 0058674
03/2008
22

Werbung

loading