3.3
3.3 WMZ 32
Installation length 295 mm
Reducing nipple 1 ½" external thread -
1" internal thread
Screw connection
VFS sensor 10 - 200 mounted with O-
rings and mounting clip.
Ensure that the VFS sensor is installed
the right way round! (with cable outlet
upwards in the direction of flow - as
shown here). Moisten the O-rings for
installation with water or, for preference,
O-ring grease.
VFS measuring tube 10-200
Screw connection 1 " – 1 ¼"
Screw-in piece
¼" external thread
O-rings (x 2, see image for installation,
surrounding groove must remain free) for
sensor sealing and mounting clip for affixing
sensor included in the scope of supply
Fig 3: Integration of the sensor technology of the WMZ 32 with dual differential pressureless manifold
EN-6
Thermal energy
meter housing,
electronics
module
for wall mounting.
VFS sensor and
temperature sensor
are connected
1 " – 1 ¼"
1" internal thread - 1
DDV-32
(not included in
the scope of
supply)
Circulating
pump
WMZ 32 pipe section,
1 1/4" external thread
and 1 1/4" internal
thread (flat-sealing)
with cutting ring screw
connection for
temperature sensor.
Sensors are only
installed after the
hydraulic
connections have
been fully made!
Connecting set (e.g.
VHS BS 1 1/4" internal
thread, flat-sealing) – not
included in the scope of
supply.