Herunterladen Inhalt Inhalt Diese Seite drucken

Grohe 39354SH0 Installationsanleitung Seite 9

Vorschau ausblenden Andere Handbücher für 39354SH0:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
Wash out foreign materials or rust inside the
pipes before connecting the product.
Failure to do so could damage the internal parts
of the product, which may cause water leakage
and/or flooding.
Note the following when using the strainer:
– Close the water shutoff valve when
removing the strainer.
– When installing the strainer, tighten it fully
so there is no gap.
– Check that the O-ring is free from foreign
materials when attaching it.
If foreign materials are attached to the O-ring,
it may cause flooding due to water leakage.
Adjust the water shutoff valve and check for
water leakage after the installation.
It may cause water leakage and/or flooding.
If the water is expected to be frozen, drain the
water out from the product until rendering it
to the client.
Failure to do so may cause fire, water leakage,
and/or flooding due to damage from freezing.
Power Supply
Use an AC 220 – 240 V power supply with a
consumption rating of 850 W. Max. 1300 W
The length of the power cord is 1.0 m.
The power cord must be connected to the 3+PE
(Pre-earth) plug and far away from the water area.
Prepare and use a 3-wired VVF cable (with 3 solid
copper wires with 0.75 mm dia. each) for the power
cord extended from the power supply of the
installation site.
The device must be connected to properly grounded
outlet.
Water Supply
Only use potable water as the water supply.
Using a different water supply (industrial water, well
water, etc.) may cause the durability of the electrical and
mechanical components to deteriorate, resulting in an
accident or malfunction.
Please firmly fix the water supply pipe.
Water Pressure
The minimum water pressure must be 0.05 MPa (0.5
bar) [flow pressure]. The maximum water pressure is
1.0 MPa (10.0 bar) [hydrostatic pressure].
Please observe this pressure range in your installation.
Minimum Installation Clearance
For the required minimum installation clearance, refer
to Figure 1.
A space of 70 mm or more on each side of the product is
recommended.
1050 (min.)
Figure 1
Confirmation on Construction
Ducting is required for the cable. Prepare the wall and
tile for bare-wall protection.
If a toilet from another manufacturer is already fitted,
concealed water connection fitting may be possible.
However, the connection dimensions need to be
identical. The products are sometimes fitted with an
information sticker with the dimensions on the protective
plate underneath the actuator plate.
For auto-flush device mounted GROHE cisterns without
ducting, the water connection can be taken visibly over
the tiles with copper piping. This means an additional
flush cable (item No. 46 944) needs to be ordered.
Copper pipe and push-fit screw connections need to be
provided on-site.
Technical Data
Rated voltage
220 - 240 V (AC), 50 / 60 Hz
Rated power consumption
850 W (environment 20°C, water 15°C)
Length of the power cord
1 m
Waterproof grade
IPX4
Protection class 1
EN13077-type AB,
EN997-CL1-5A+CL2
Water pressure range
0.05 MPa (0.5 bar) [flow pressure] - 1.0 MPa (10.0 bar)
[hydrostatic pressure]
Water connection cross section
Operating temperature range
0°C - 40°C
Units
V = volt, Hz = hertz, W = watt, m = metre, MPa =
megapascal, in = inch, °C = degrees Celsius
Flushing water volume
Europe: full 5 L, light 3 L
China: full 4.5 L, light 3 L
70 (min.)
700 (min.)
375
70 (min.)
Unit: mm
7
GB

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

18801sh0Sensia arena

Inhaltsverzeichnis