Herunterladen Inhalt Inhalt Diese Seite drucken

General Information; Setting Up Room For Shower Tray And Shower Enclosure - HOESCH SensePerience Planungs-, Montage- Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
01

General information

Hoesch products set the benchmark for quality, comfort and design. To assure optimal function and a long life cycle of your product
please comply with the following instructions. Each delivery is strictly controlled before leaving the factory. Check the completeness
of the delivery before starting installation. Products represented here are subject to technical and visual modifi cations! All dimensions
data is in mm. All connection measures are internal measurements! We are not liable for defects resulting from non-conventional usage,
improper transport or faulty intermediate storage. Our respectively valid warranty conditions are in force.
During mounting protect the surface of shower tray with cover!
Do not put glass panes on rims or corners!
Caution!
Check the delivery for transport damage! Later claims will not be accepted!
The choice of raw plug and screws depends upon the wall's material!
Water connections
At installation to potable water supply, service technician or user must connect fi rst a safety device according to local
regulations. It should be noted that a backfl ow protection device willingly (EN61770) (VDE 0700 Part 600) in water connection
must be provided by the user.
Penetrations through walls must be sealed with permanently elastic joint sealant. The installation must be rinsed acc. to
DIN1988.
The customer must provide a dirt pan in the interior installation.
We point out that water-softening equipment should be installed to soften water supplied to the steam generator!
Hot water supply DN 15/20 supply fl ange Rp ½", recommended fl ow pressure 200-500 kPa, 60-70ºC.
Attention: thermal disinfection (short time temperature increase up to 70ºC) should be ensured!
GB
Cold water connection DN 15/20 supply fl ange Rp ½", recommended fl ow pressure 200-500 kPa.
A ball shut-off valve R ½" shall be provided for both connections.
Wall outfl ow DN 50/40 for steam generator drainage - see point 07.
Wall-concealed siphon included in connection set (Art.-no 27775)
Please note:
during the pipe installation a siphon for wall mounting (item no. 27775) is required, to ensure an unproblematic
installation of the steam cabin without shower tray. A siphon for wall mounting is required for the draining of the
steam generator and sent dispenser!
Electrical installation
A separate feed cable of 3x2.5mm² ( 2m long out of the wall) and a ground cable 1x4mm² should be provided for electrical
connection (230 V at 50 Hz, 20 A) according to point 07.
The device must be protected by a separate FI-switch / RCD (30mA), which disconnects all poles of the system with a contact
opening at least 3 mm wide. We strongly recommend to connect the unit to power supply system via all -poles power cut-off
switch (20 A, min. 3mm opening width, please pay attention to protection areas).
The device must be connected to the mains electricity supply in accordance with the building regulations using all-pole
disconnecting mains switch.
The device should be connected to electricity only via a fi xed feed cable according to local regulations. Installation and repair
should be performed only by authorized service.
Note:
All electrical work must be performed by a qualifi ed electrician in accordance with DIN/EN specifi cations (DIN VDE
0100-701, etc.), national regulations and local EVU regulations!

01.01 Setting up room for shower tray and shower enclosure

Separate electrical units that produces steam or moisture should not be used inside the cabine.
The cabin is designed for setting up in front of the wall.
The wall drain must be installed in the indicated area.
Observe ceiling height of the room when installing the steam cabin with platform provided by customer.
Make sure there is a clearance of at least 120mm from the top of the cabin to the ceiling.
The cabin has been designed for installation on masonry walls, in order to ensure a reliable fastening.
The walls must be completely tiled over the cubicle's entire height before the fi tting.
The fl oor at the place of installation must be completely fl at.
When preparing the assembly stand (version D) in the area of steam cabin a slope for water runoff should be ensured. The
right ground level for glass sheeds fi xing and outside the cabin for door opening should also be guaranteed. For this purpose
please use the attached template.
For the assembly of the shower tray (version B and C), a concrete fl oor or a styrofoam carriers can be used. Please pay
attention to the manufacturer's specifi cations. Load capacity of a minimum 250 kg/m² should be guaranteed.
Walls must be vertikal.
For constructional reasons in case of frameless shower enclosures absolute waterproofness is not possible.
For the safety reasons this device should not be used by physically and mentally disabled people (and children) or by people without
relevant experience or knowledge, unless they use it, under supervision of relevant persons or get the instruction how to use it.
Children should use this product only under adult's supervision.
10

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis