Herunterladen Inhalt Inhalt Diese Seite drucken

General Instructions - Novoferm TH100 Montage-, Wartungs-, Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Contents
Introduction ...............................................6

General instructions .................................6

1. Preparation .........................................7
2. Fitter installation ................................7
3. Roller shutter door with
GB
indirect drive (chain and pinion) ........7
4. Installation of roll­up system ............7
5. Installation of roller door curtain ......7
6. Installation of end piece
for roller shutters with safety edge ...7
7. Installation of side guides ..................7
8. Lintel seal ...........................................7
9. Locking (special accessory) ...............8
10. Installation of cover box .....................8
11. Electrical connection..........................8
12. Troubleshooting ..................................8
13. Safety regulations ..............................8
14. Maintenance and operating
instructions ........................................9
Image section ................................. 42 ­ 49
6
Introduction
Every roller shutter is a complex structure
which consists of many individual parts that
interlock seamlessly. This is true for high­
speed shutter doors as well as the more
transparent link grille shutters.
The more precisely such a high­quality
product is installed and the more profes­
sionally it is operated and maintained, the
better it will perform in everyday use.
These assembly, operating and mainte­
nance instructions are intended to ensure
optimal performance of this Novoferm
product.
Information on Novoferm products
is also available on our website
www.novoferm.co.uk
General instructions
The roller shutters are rated for a maxi-
mum wind pressure of 500 N/m² (wind
force 10) and 30 000 cycles.
The door system must only be fitted by
qualified staff as per EN 12635.
Before proceeding with installation work,
please read the installation manual and
other specific descriptions (e.g. door drive,
anti run­off device) thoroughly and observe
the corresponding drawings and instruc­
tions.
Welding work must only be carried out by
persons with a valid welder's certificate as
per EN 287­1.
Changes to the parts or arrangements
which do not conform to the design are not
allowed. If necessary, the manufacturer's
approval must be obtained.
Proper installation is to be documented on
handing the systems over to the customer.
Dismantling must take place in reverse
order to the assembly instructions. When
replacing drives or bearings, the roller
curtain has to be lowered completely and
the top roller secured.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

V80Eco speedTh80

Inhaltsverzeichnis