Herunterladen Inhalt Inhalt Diese Seite drucken

Accessories; Ec Declaration Of Conformity En; Installing The Unit (Only For Experts); Electrical Installation - Kärcher WRH 1200 Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Accessories

Filter inlay
Order No. 5.033-239.0
Filter fill active carbon filter
Order No. 4.414-014.0
Funnel
Order No. 4.901-090.0
Special funnel to fill in the active carbon fil-
ter filling
Attachment kit active carbon filter
Order No. 2.641-831.0
Additional active carbon filter
Attachment set 'Fresh water switching'
Order No. 2.641-521.0
Manual switching between processed/
fresh water for using fresh water in the
high-pressure cleaner (for e.g. for rinsing).
Attachment set input valve
Order No. 4.640-230.0
To throttle a raw water pump that is running
too high.
Attachment kit ventilation
Order No. 2.641-510.0
Usage water ventilation to avoid bother-
some odours
Attachment kit overflow
Order No. 2.641-868.0
Second floater switch in the pump basin,
emits signal to external alarm setup, if the
pump basin is too full
Attachment kit support leg
Order No. 2.641-849.0
Support legs for filter module, if a wall
mounting is not possible
Immersion pump
Order No. 6.474-073.0
Immersion pump as raw water pump
16
EC Declaration of Conformity
We hereby declare that the machine de-
scribed below complies with the relevant
basic safety and health requirements of the
EU Directives, both in its basic design and
construction as well as in the version put
into circulation by us. This declaration shall
cease to be valid if the machine is modified
without our prior approval.
Product:
Effluent treatment plant
Type:
1.217-xxx
Relevant EU Directives
2006/95/EEC
2004/108/EC
Applied harmonized standards
EN 60204–1
EN 55014–1: 2006 + A1: 2009
EN 55014–2: 1997 + A2: 2008
EN 61000–3–2: 2006 + A2: 2009
EN 61000–3–3: 2008
EN 62233: 2008
The undersigned act on behalf and under
the power of attorney of the company man-
agement.
CEO
Head of Approbation
Authorised Documentation Representative
S. Reiser
Alfred Kärcher GmbH Co. KG
Alfred-Kärcher-Str. 28 - 40
71364 Winnenden (Germany)
Phone: +49 7195 14-0
Fax: +49 7195 14-2212
Winnenden, 2011/07/01
Installing the unit
(only for experts)
Notice
The equipment may only be installed by an
mechanic of Kärcher
or an from Kärcher authorized individual
Preparing the installation place
The following requirements are necessary
in order to install the equipment:
frost-free room with adequate ventila-
tion and exhausts
sufficient lighting at the installation site
Floor path for collecting sludge
Strong wall for fastening the system
The ground must be stabile and tight.
Unpack the equipment
Unpack the equpiment and dispose of the
packing material properly.
7
-
EN

Electrical installation

The machine must have an FI fuse of type
B, 30 mA.
The electrical connection of the system
may only be performed by a qualified elec-
trician. Please follow the respective nation-
al regulations!
Electrical installation as per IEC 60364-1
Water installation
The water installation depends on the spe-
cific conditions of the existing plant compo-
nents such as
Type and model of high pressure cleaner
Note
The processed water outlet of the system is
directly connected to the water inlet of the
high-pressure cleaner. This can lead to
foam formation in the swimmer tank in
high-pressure cleaners with a swimmer
tank. In such a case, the high-pressure
cleaner must be switched to suction opera-
tioins (see separate operating instructions
of the high-pressure cleaner).
Type and models of building-side com-
ponents (sludge collector, pump basin,
etc.)
Nominal widtht, lengths and type of
channels
Hence, the water installation must be done
according to the specific local conditions.
The immersion pump specifications in the
building must meet the requirements out-
line in the "Technical Data / Immersion
Pump Requirements" section.
Danger
Risk of injury on account of tripping and fall-
ing.
Lay the hoses of the plant in such a way
that they do not pose a risk for tripping and
falling.
Note
During startup, set the multi-channel valve
to the position "BACKWASH" and rinse the
system until all bubbles have escaped from
the filament filter. After that, set the multi-
channel valve to "FILTRATION".

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis