Herunterladen Inhalt Inhalt Diese Seite drucken

Putting Into Operation; Technical Data - STUDER REVOX PR99 Bedienungsanleitung

Tonbandmaschine
Vorschau ausblenden Andere Handbücher für PR99:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

PRE-
OPERATIONAL CHECKS
-
Does the setting of the voltage selector at the
rear panel match the local mains voltage?
-
Remove fuse and check whether
it
matches
thetechnical specifications.
This check
is
man-
datory
if
the voltage selector needs to be ad-
justed
-
Briefly turn reel support by hand
to
make sure
that the brake bands are not blocked.
PUTTING INTO OPERATION
Establ ish AF (audio
frequency) connections
(general plan located on the inside of the
fold-out
page)
All toggle switches must
be
flipped down.
Any lock-down button which
has been de-
pressed
will
return
to
its
off position when
it
is
depressed a second time.
The machine can now be connected to the
mains.
CONTENTS
Warranty
Blockdiagram
SUMMARY
OF OPERATING
CONTROLS
CONNECTION
POSSIBILITIES
Connection
panel
INDEX
OF OPERATING
ELEMENTS
OUICK
REFERENCE
OPERATING INSTRUCTIONS
Reel
mounting
Operating the tape
Reproduction
Recording
FUNCTION
OF
THE
OPERATING
CONTROLS
DETAILED
OPERATING DESCRIPTION
Reproduction
Mono
recordings
Stereo recordings
Principle diagram
Revox
PR99
SPECIAL APPLICATION
Copying
Playback-recording
Echo
arrangements
TECHNICAL SUPPLEMENT
Care
and maintenance
Calibration and recalibrations
TECHNICAL DATA
Dimensions
Page
1
2
4
4
4
5
6
6
6
7
7
B
10
10
10
11
11
12
12
12
1.)
14
14
14
17
1B

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für STUDER REVOX PR99

Inhaltsverzeichnis