Herunterladen Inhalt Inhalt Diese Seite drucken

Start Up - Kärcher HD 10/16-4 Cage Betriebsanleitung

Vorschau ausblenden Andere Handbücher für HD 10/16-4 Cage:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Power switch
The switch prevents unintented starting of
the appliance. Stop the appliance during
breaks or after operation.
Hand wheel of hand spray gun
The hand wheel on the hand spray gun in
zero position prevents the appliance from
being switched on unintentionally.
Overflow valve
– While reducing the water supply/quanti-
ty regulation at the pump head, the
overflow valve opens and part of the
water flows back to the pump suck side.
– If the hand spray gun is closed, the wa-
ter will flow into the swimmer container
via the overflow valve. This will create a
water circuit.
– If the hand spray gun is opened, the
overflow will close. The spray pressure
will be reactivated.
The overflow valve is set by the manufac-
turer and sealed. Setting only by customer
service.
Safety valve
– With excessive pressure, the safety
valve will open. The emitted cleaning
liquid protects the pump and the high-
pressure hoses from damages by ex-
cessive pressure.
The safety valve is set by the manufacturer
and sealed. Setting only by customer serv-
ice.
Parking brake
The parking brake prevents the appliance
from rolling off.

Start up

Danger
Risk of injury! Device, tubes, high pressure
hose and connections must be in faultless
condition. Otherwise, the appliance must
not be used.
Lock parking brake.
16
English
Check oil level
Cut off tip of oil filling nozzle.
Check oil level of the high pressure
pump.
The oil level must be between the "MIN"
and "MAX" markings on the oil contain-
er.
Add oil if required (see technical speci-
fications).
Warning
In case of lacteous oil inform Kärcher cus-
tomer service immediately
Installing the pushing handle
Install the pushing handle on the pipe
frame.
Attaching the Accessories
Connect high pressure hose and spray
pipe to the hand spray gun.
Screw the exchange nozzle onto the
spray pipe.
Mount the power nozzle (with two flat
connection) and the round jet nozzle on
the exchange nozzle. Tighten the cov-
ering nuts fingertight.
Connect the high pressure host to the
high pressure connection point of the
machine.
Power supply
– For connection values refer to technical
specifications
– The electrical connections must be
done by an electrician according to IEC
60364-1.
– As is standard, the machine is equipped
with an EEx plug. If the existing socket
does not match this plug, it must be ad-
justed accordingly by a technician.
Warning
The highest allowed net impedance at the
electrical connection point (refer to techni-
cal data) is not to be exceeded.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis