9. Connect the appliance to the mains properly.
10. All required installations for the electric and water supply must be carried out
by a qualified professional.
11. The nameplate is situated at the back of the appliance.

2.2 Removing of the shipping bolts

1. Remove the four shipping bolts using the
provided wrench. Start with the lower bolts.
2. Insert the four caps into the holes.
3. Keep the bolts and the wrench for future
use.

2.3 Levelling

1. Install the appliance on a flat and solid
ground only.
2. Turn the adjustable feet for horizontal
alignment.
a. Raise: clockwise.
b. Lower: anti-clockwise.