Herunterladen Diese Seite drucken

Getting Started - Sartorius Combics Option Y2 CAIS Serie Installations Anleitung

Werbung

Getting Started

4
Installation Instructions Option Y2
Getting Started
If necessary, connect the weighing platform (not applicable to Combics CAW.S..
complete scales):
$ See the operating instructions supplied with the particular indicator.
Connect the equipment to AC power:
$ See the operating instructions supplied with the particular Combics indicator.
$ Min. torque that must be applied the cable gland when connecting the equipment
to AC power: 3 Nm
$ Min. torque for other cable glands: 5 Nm
Connect an equipotential bonding conductor (CAIS indicators and CAW.S..
complete scales) = grounding:
§ Connect the device to a central equipotential busbar (not included in delivery) using
a grounding conductor.
§ If necessary, seal the Combics indicator to protect it from vapors as follows:
– Use a torque wrench
– Apply 1 Nm torque to each of the 10 screws
§ Make sure the integrity of the IP67/IP69K protection is not damaged or impaired while
performing installation work. For more information about industrial protection,
contact the Sartorius Service Center.

Werbung

loading