1.
De-energise the unit.
2.
Remove the front cover
3.
Strip the cable to obtain 7 mm blank cable wires.
4.
Insert the cable through a cable opening.
5.
Connect the cable to the terminals with (SW) and (+).
6.
Tighten the cable connector to guarantee its leak-tightness.
7.
Refit the front cover.
8.
Put the sensor into operation.
Assembly and installation
23