Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly; Mounting The Control Lever Guide Zi-Hs8Pt; Mounting The Control Lever Guide Zi-Hs10T / Zi-Hs12T - Zipper ZI-HS8PT Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

13.2

Assembly

All parts unpack, check the log splitter to dust and debris, clean as necessary.
The use of paint thinners, gasoline, harsh chemicals or abrasive cleaners leads to
damage to the surfaces!
Therefore:
When cleaning, use only mild detergent

13.2.1 Mounting the control lever guide ZI-HS8PT

For the following installations, a second person is needed for assistance
 Insert the left operating lever guide by a 2nd
person to the joint holder.
 Slide the screw and washer (A) through the
bore of the control lever guide on the holder.
 Below that, you put the washer and M10 nut
on the screw.
 The screw and nut tighten so that the oper-
ating lever guide is still moving.
Repeat this process for the right-hand control
lever guide
13.2.2 Mounting the control lever guide
ZI-HS10T / ZI-HS12T
 The large washer on the screw M10x30 hang
up.
 Insert the left operating lever guide by a 2nd
person to the joint holder.
 Slide the bolt with washer through the hole of
the operating lever guide to the bracket.
 Below that, you put the washer and M10 nut
on the screw.
 The screw and nut tighten so that the control
lever is still moving.
Repeat this process for the right-hand control
lever guide
Z.I.P.P.E.R Maschinen Austria  www.Zipper-maschinen.at
N O T E
HOLZSPALTER / LOG SPLITTER
ASSEMBLY
Seite 30
ZI-HS8PT / ZI-HS10T / ZI-HS12T

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Zi-hs10tZi-hs12t

Inhaltsverzeichnis