INSTALLATION/CONNECTION

4 Installation/Connection

4.1 Installation instructions

Please note the installation of the SHLCN90 following installation guidelines:
•Fasten the device only with the included bolts .
•The minimum distance between two systems in row major order must be at least 200 mm (measuring point system in the
middle).
•The distance of the staple guide the workpiece during stapling operation must be at least 3 mm. We recommend a
height-adjustable mounting of the system.

4.2 Compressed air connection

Explosion hazard
The use of oxygen or other flammable gases as energy sources is strictly prohibited
Explosion hazard!
The connection to the compressed air network is via an air hose with quick coupling (enclosed). The non-closing nipple
should be positioned so that the system the releasing of the connection is immediate pressure. Please note when
connecting to the compressed air system the following points:
•The compressor (compressor) must have sufficient power.
•The supplied air must not exceed the max. allowable operating pressure (8.3 bar) for not more than 10% exceed.
•Install in the compressed air supply line, a pressure regulator and a shutoff valve.
•Use only filtered, lightly oiled compressed air for operation of the High Load tool.
Run the electrical and pneumatic connections according to plan by.

4.3 Electrical plan

Info
The trigger pulses must be at least 0.05 s rest.
Trigger pulse
Connector tool side
Connector contact side
Signal duration: 50ms
Feed control
(driving control)
brown
blue
black
drive signal
Magazine feed control
brown
blue
black
magazine feed signal
7
7
GB