Herunterladen Diese Seite drucken

Zenit Grey Serie Installation Und Betrieb Seite 31

Tauchmotorpumpen
Vorschau ausblenden Andere Handbücher für Grey Serie:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 63
better together
Ensure that the switch from shut down to start-up
occurs only and exclusively if the floats find themselves in the position shown in Fig 11A, 11B, 11C, 11D.
Ensure that the switch from start-up to shut down
occurs only and exclusively if the floats find themselves in the position shown in Fig 12A, 12B, 12C, 12D.
The electric connection of the floats must be carried out in such a way that ensures the shutdown of the pump in cases of a malfunctioning float.
Make sure that effective volume of the tank does not become so low that the number of starts per hour exceeds the maximum
admitted.
S1
MAX
ON
11 A
S1
OFF
MIN
12 A
S3
MAX
ON
11 B
S3
MIN
OFF
12 B
S3
ON
MAX
11 C
S3
OFF
MIN
12 C
Safety, Installation and Operations Manual - Original instructions
S3
ON
MAX
11 D
S3
OFF
MIN
12 D
EN
31

Werbung

loading