Herunterladen Diese Seite drucken

Deye BOS-G Serie Montage- Und Bedienungsanleitung Seite 96

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

• Using the monitoring software, check whether the SoC, SoH, battery voltage and temperature
of the battery module are abnormal.
• Shut down and restart BOS-G once a year.
Note: If the system is installed in a polluted environment, maintenance and cleaning must be
carried out at short intervals.
Note: Clean the battery rack with a dry-cleaning cloth. Ensure that no moisture comes into
contact with the battery connections. Do not use solvents.
8.2 USB's Upgrade Step
① USB type: USB2.0, FAT32;
② Create the upgrade folder according to the directory;
③ Place the upgrade file provided by the supplier in the upgrade folder;
④ Turn on the battery, and insert the USB flash disk after the blue indicator is on;
⑤ After the blue light indicator flashes and turns off, pull out the USB flash disk to complete the
upgrade. Do not turn off the battery during the process.
⑥ After the blue light indicator of the battery lights up again, check the version number through
the screen or app and verify the upgrade result.
9. Battery Module Storage
①To ensure the battery service life, the storage temperature shall be kept between 0°C~35°C.
②The battery shall be cycled at least once every 6 months.
95

Werbung

loading

Verwandte Produkte für Deye BOS-G Serie