Take out the ground wire A and connect one end of it to the M4 rivet nut of the high-voltage
control box panel, and the other end to any M6 screw hole of the cross beam above the rack.
Take out the ground wire B (user need to prepare in advance) and connect one end of it to any
M6 screw hole of the cross beam under the rack, and the other end to the customer's grounding
point. (The length of the ground wire B is determined based on the customer's condition.)
4.9.2 Battery installation cable Description
For details on how to connect all cables, see Section 4.8.
77