Deye BOS-G Serie Montage- Und Bedienungsanleitung Seite 63

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The battery energy storage system can be damaged, if not properly transported. The
battery module can only be transported vertically. Note that these parts may be top-heavy.
Failure to follow this instruction may result in damage to the part.
During transportation, the battery storage rack may be damaged when it is installed with
the battery module. The battery storage rack is not designed to be transported with the installed
battery modules. Always transport the battery module and the battery rack separately. Once the
battery module is installed, do not move the battery rack, and do not lift it by a lifting device.
If possible, do not remove the transport packaging before arrival at the installation site.
Before removing the transport protector, check if the transport packaging is damaged, and check
the impact indicator on the outer packaging of the battery converter. If the impact indicator is
triggered, the possibility of transport damage cannot be ruled out.
Improper transportation of battery modules may cause injury. The single battery module
weighs 44 kg. If it falls or slips, it may cause injury. Only use suitable transport and lifting
equipment to ensure safe transport.
Wear safety shoes to avoid the danger of injury. When transporting the battery rack and
battery module, their parts may be crushed due to their heavy weight. Therefore, all persons
involved in transportation must wear safety shoes with toe caps. Please observe the safety
regulations for transportation at the end customer's site, especially during loading and unloading.
During transportation and installation of unpacked battery storage cabinets, the risk of
injury increases, especially on sharp metal panels. Therefore, all personnel involved in
transportation and installation must wear protective gloves.
The maximum weight of a single rack of BOS-G can reach 594kg. We suggest that at least
2-3 people work together to install the battery rack. The lifting device is helpful for heavy parts,
and the pulley or cart for light parts. Be careful not to damage the case. The number of battery
modules stacked shall not be more than 8.
Check whether the delivery is complete.