Herunterladen Diese Seite drucken

Deye BOS-G Serie Montage- Und Bedienungsanleitung Seite 55

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1.Important information in the manual
1.1 Scope
The installation and operation manual applies to the modular battery energy storage system.
Please carefully read this installation and operation manual to ensure the safe installation,
preliminary debugging, and maintenance of BOS-G. Installation, preliminary debugging, and
maintenance must be carried out by qualified and authorized personnel. Please keep this
installation and operation manual and other applicable documents near the battery energy
storage system, so that all personnel involved in installation or maintenance can access this
installation and operation manual at any time.
This installation and operation manual only applies to countries meeting the certification
requirements. Please observe the applicable local laws, regulations, and standards. Standards
and legal provisions of other countries may be inconsistent with the provisions and specifications
in this manual. In this case, please contact our after-sales service personnel, hotline: +86 0574
8612 0560, email: service-ess@deye.com.cn.
1.2 Description of BOS-G
System
Model
energy
(kWh)
BOS-G15 15.36
BOS-G20 20.48
BOS-G25 25.6
BOS-G30 30.72
BOS-G35 35.84
BOS-G40 40.96
BOS-G45 46.08
BOS-G50 51.2
BOS-G55 56.32
BOS-G60 61.44
Rated DC power
Discharge depth
(kW)
15.36
90%
20.48
90%
25.6
90%
30.72
90%
35.84
90%
40.96
90%
46.08
90%
51.2
90%
56.32
90%
61.44
90%
Composition
BOS-GM5.1*3+HVB750V/100A*1
BOS-GM5.1*4+HVB750V/100A*1
BOS-GM5.1*5+HVB750V/100A*1
BOS-GM5.1*6+HVB750V/100A*1
BOS-GM5.1*7+HVB750V/100A*1
BOS-GM5.1*8+HVB750V/100A*1
BOS-GM5.1*9+HVB750V/100A*1
BOS-GM5.1*10+HVB750V/100A*1
BOS-GM5.1*11+HVB750V/100A*1
BOS-GM5.1*12+HVB750V/100A*1
54

Werbung

loading

Verwandte Produkte für Deye BOS-G Serie