Herunterladen Diese Seite drucken

Deye BOS-G Serie Montage- Und Bedienungsanleitung Seite 84

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.12 Procedure for configuring battery packs
Steps:
① After connecting the battery cables, press the air switch button on the high-voltage control
box to turn OFF to ON.
② Press the start button and wait for the screen to light up.
③ Click the
icon on screen to enter the maintenance system password confirmation
interface.
④ Enter the password 123 and press the Confirm key to enter the main interface of system
maintenance. The operation shall be performed by a professional.
83

Werbung

loading

Verwandte Produkte für Deye BOS-G Serie