Herunterladen Diese Seite drucken

Endress+Hauser Deltabar S PMD70 Austauschanleitung Seite 10

Austausch der sensorbaugruppe
Vorschau ausblenden Andere Handbücher für Deltabar S PMD70:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

KA603P/00/a2/12.06
Assembly of sensor on stainless steel housing F17
0
2
1
sensor
2
1
0
4
Ex i-devices:
The repair has to be performed such, that the voltage isolation of the Ex ia circuits against ground is maintained.
If required, a test can be performed with 500 Veff over a time period of 60 s.
Ex d-devices:
Attention has to be paid not to damage the threads.
In other case the part has to be exchanged.
new
1
sealing ring
O-ring
3
45.69 x 2.62 EPDM
2
new
locking ring
4
set screw
Any repair of a certified device has to be documented!
This includes stating the device serial number, date of repair, type of repair and name of the repair technician.
Exchange of sensor unit on Deltabar S PMD70
Mounting the sensor on housing
1
Insert new sealing ring into the groove in the
housing, take care to the mounting position.
2
Insert new locking ring at the sensor head
The locking ring limits the alignment of the housing
on the sensor.
3
Renew both O-rings at sensor head
(new O-ring is already mounted on spare sensor).
4
Place housing on sensor head and screw it on the
sensor until stop (9 turns).
After appropriate assembly the housing can be turned for more
than a complete turn (380°) until the locking ring stops the
rotation.
Mounting the instrument
Assembly of the complete instrument has to be done
in the reverse order to the disassembly,
see page 1 (step 5 ... 1 ).
Re-install instrument, connect cables at terminal.
Adjust housing to desired position.
Important:
After the alignment of the housing tighten the set
screw firmly to achieve an optimal potential
equalization between process vessel and ground of
the housing. Especially the electromagnetic
compatibility of the electronics will be improved.
Endress+Hauser

Werbung

loading