1 | MI_2202: Energy optimisation iCombi Pro Classic
2. Connect the cables to the energy optimisation board.
L1=black
N=blue
PE=yellow/green)
3. Plug in the cable "cable set Sico. with auxiliary connector" on the I/O
board (X76). Also connect the brown cable to the I/O board (X29).
6-2/3: The cable is already in the specified slot. This should be replaced
with the new one.
Notice: The I/O board is installed with the turned 6-2/3 180°. For this
reason, the specified slot is at the lower end of the I/O board.
4. Plug the auxiliary contact onto the contactor.
5. Notice: Earthing is carried out in different ways.
6-2/3: Replace the currently installed protective conductor terminal with
the 3-way protective conductor terminal. Then connect the protective
conductors (PE).
6-1/1, 6-2/1, 10-1/1 & 10-2/1: Earthing is attached directly to the