Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Operator Responsibilities; If The Alarm Sounds - BWT AQA stop Einbau- Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
5

Installation

► The effectiveness of the AQA stop
► The unit requires a constant power
► When the power supply is interrupt-
The device can be installed either on a water
line with commercially available fittings or in a
HydroModul section using BWT accessories.
If the water meter is located in the same room,
then the AQA stop should be installed immediately
downstream of the water meter.
The device may be installed at any orientation,
provided the direction of flow (as indicated by the
arrow) is observed correctly.
After installation, check for leaks. The control elec-
tronics must not get wet.
Plug the power supply into a mains socket.
The operating indicator lights up in blue.
16
Note
is restricted to the room in which the
sensor is located.
supply.
ed (e.g. due to a power outage), the
device closes off the water supply.
Sampling valve
Filter
AQA
stop
Pressure reducer, metering unit
may be required depending on
operating conditions
Floor sensor
6

Operator responsibilities

The correct functioning of the AQA stop must be
verified and recorded at least every six months by
dipping the sensor into water.
The valve must close and the alarm buzzer must
sound.
Reset the alarm by drying off the sensor and briefly
unplugging the mains connection.
7

If the alarm sounds

Pull the mains plug and determine what caused
the fault.
Possible causes:
● The sensor is lying in water. Water damage.
Determine cause.
● Sensor short-circuited (e.g. by a piece of metal).
● Brief power outage.
Remedial action:
● Dry off the sensor and plug in the mains connec-
tion once more.
Garden water pipe,
filling pipe for swimming pool
Sampling valve
Softener
Cold drinking water,
warm drinking water
Metering
unit
Floor drain

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis