Herunterladen Inhalt Inhalt Diese Seite drucken

KERN EMB-V Serie Betriebsanleitung Seite 70

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Install the density kit
 Disconnect scale from power supply.
 Remove the standard weighing plate and replace it with the density kit.
!
Model EMB 2000-2V
Ensuring correct positioning, see illustration below.
 Place the platform for glass containers in a way that it does not touch the
weighing plate.
 Place beaker in the centre of the platform Make sure that it has no contact
with the frame.
 Hang the immersion basket on the rack. Make sure that it is centred in the
recess.
 Pour the liquid into the glass beaker. Filling height should be approx. ¾ of the
capacity. Immerse thermometer
 Heat the liquid, the instruments or the displacement body until the
temperature is constant. Observe the warm-up time of the balance.
For more information, please refer to the operating manual supplied
with the density kit.
20
EMB-V-BA-e-1422

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Emb 200-3vEmb 2000-2v

Inhaltsverzeichnis