5. Operation
5.1
DT-MOBIL PRO ST and PE
5.1.1
Storage
Do not expose the DT-Mobil to direct sunlight for
extended periods either during transport or when in
storage. Excessive heating can degrade the quality
of the high-grade plastic container.
If heating produces overpressure in the sealed
container, this overpressure will be released via
the safety valve e.
Suitable storage conditions:
•
ambient temperatures from - 10 °C to + 40 °C.
•
level surface.
•
canopy for storage outdoors
5.1.2
Loading the filling station
Risk of injury!
The lid must be closed.
i
Important!
Close ball valve of the delivery line c
i
Note:
When moving or loading the filling station
with a lifting truck or forklift, the length of
the fork must be at least 1.35 m. If the
fork is shorter, a fork extension must be
used. Otherwise the fork may damage
the underside of the filling station.
5.1.2.1 Moving with lifting truck
The DT-Mobile can be moved with the lifting truck
on a firm, level surface.
The lifting point is between the forklift slots on the
underside.
5.1.2.2 Loading with a forklift
i
Important!
Use the provided forklift slots on the un-
derside as lifting points for safe lifting with
the forklift.
5.1.2.3 Loading with a crane
Danger!
A DT-Mobil can cause severe injuries if
it falls.
Do not stand under suspended loads
during crane operations.
i
Important!
Do not damage the lid with the crane
slings!
•
the crane lugs provided at the top of the tank
are to be used for crane operations.
•
attach 4 suitable load
handling devices of
equal length to the
crane lugs
(minimum
length 2 m).
•
the DT-Mobil can
be loaded onto
or unloaded
from the
transport
vehicle.