Transport of the machine
To move the machine, take out the transport handle
(1) and to warrant a secure transport twist the
handle (2). ( Backup by screw head in transport
handle)
Rocker lock
• To transport the rocker circular saw lock in place
the rocker lock in position (1).
Electrical connection
• Connect the machine with a CEE-plug to the power supply, provided supply should be 16 .
• Switch on the machine with the power switch, the saw shaft runs up.
• Upon switching off the saw shaft is slowed down within 10 seconds.
Changing of rolling direction
The installed electrical motor is connected ready to operate. The connection com-
plies with the relevant VDE and DIN-regulations. The power supplied by the custo-
mer as well as the used extension cable should comply with these regulations resp. the
local regulations.
Seite:36
2
1
1