Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - HBM Z6AM Montageanleitung

Vorschau ausblenden Andere Handbücher für Z6AM:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operation

6
Operation
S Dust, dirt and other foreign bodies must not be allowed to collect in such a
way that movement of the transducer (bellows) is restricted.
S The gap for the overload stop and lateral stops must also be kept free of
contamination.
S The play of the overload stop (for details see table "Specifications for the
weighing module") should be checked at regular intervals, for instance with
a feeler gage, and be readjusted if necessary.
S The weighing modules should not be completely relieved of load. This pre­
vents the load application elements from lifting out.
S Lateral displacements which exceed the maximum permissible value and do
not act in the direction of the stay rods should be avoided by aligning the
other modules appropriately, or should be absorbed by other stops or reten­
tion devices.
S The play in the stay rods should be regularly checked and if necessary re­
adjusted.
10
A01559_03_Y00_00 HBM: public
Z6AM

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis