EN
This is to certify that the product was installed, commissioned and function-
tested in accordance with these operating instructions.
Pump OFF: ____________________________ mbar
Pump ON: _____________________________ mbar
Alarm ON: _____________________________ mbar
Alarm OFF: ____________________________ mbar
Pressure drop entire system: _______________ mbar
in ______________ minutes
Tank as per standard: ________________________
Year of manufacture: _________________________
Litres: _____________________________________
Factory no.:_________________________________
O aboveground O underground
Eurovac HV