Connecting Drain Pipe - Toshiba MMU-UP0091H-E Installationsanleitung

Vorschau ausblenden Andere Handbücher für MMU-UP0091H-E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 25
Attached hose
VP25 vinyl chloride pipe
band
Drain pipe
(Locally procured)
connecting port
(Hard socket)
Attached flexible hose
Socket for VP25
Soft socket
(Locally procured)
Hard socket
Adhesive inhibited:
Use the attached flexible hose and hose band for
connecting the drain hose to the clear drain socket.
If applying the adhesive, socket will be damaged and
cause water leakage.
5 mm or less
10 - 12 mm
Drain pipe
connecting port
(Colour:
Hard polyvinyl
transparent)
chloride pipe VP25
10 mm
(Locally procured)
Flexible hose
Hard polyvinyl
Heat insulating
(Accessory)
chloride pipe
material
socket for VP25
(Locally procured)
 Connecting drain pipe
• Connect a hard socket (locally procured) to the hard
socket of the attached supplied flexible hose.
• Connect a drain pipe (locally procured) to the
connected hard socket.
REQUIREMENT
• Connect hard vinyl chloride pipes securely using an
adhesive for vinyl chloride to avoid water leakage.
• It takes some time until the adhesive is dried and
hardened (refer to the manual of the adhesive). Do not
apply stress to the joint with the drain pipe during this
time period.
211-EN
 Drain up
When a down-gradient cannot be secured for the
drainpipe, drain-up piping is possible.
• The height of the drain pipe must be 850 mm or less
from the bottom of the ceiling.
• Take the drain pipe out of the drain pipe joint with the
indoor unit in 300 mm or less, and bend up the pipe
vertically.
• Immediately after the pipe is bent up vertically, lay
the pipe making a down-gradient.
• Set downward grading immediately after raising up
vertically.
Hose band
tightening
allowance
300 mm or less
Indoor unit
 Check the draining
In the test run, check that water drain is properly
performed and water does not leak from the connecting
part of the pipes.
Check that there are no abnormal motor sounds from
the drain pump as well.
Check draining also when installed in heating period.
By using a pitcher or hose, pour water (1500 - 2000 cc)
into the discharge port before installation of the ceiling
panel.
Pour water gradually so that water does not spread on
the motor of the drain pump.
CAUTION
CAUTION
Pour water gently so that it does not spread around
inside the indoor unit, which may cause a malfunction.
Heat
exchanger
Insert the hose end between the heat
exchanger and drain pan and bend it
Kerosene pump or water injection
• After the electric work has finished, pour water
during COOL mode operation.
• If the electric work has not yet finished, pull out the
float switch connector (CN34: Red) from the
electrical control box, and check draining by plugging
Underside of ceiling
the single phase 208 to 240 V power to the terminal
blocks (L) and (N).
If doing so, the drain pump motor operates.
(Never apply 208 to 240 V to (Uv (U1)), (Uv (U2)),
(A), (B)
otherwise a trouble of P.C. board occurs.)
• Test water drain while checking the operation sound
of the drain pump motor.
(If the operation sound changes from continuous
sound to intermittent sound, water is normally
drained.)
After the check, the drain pump motor runs,
connecting the float switch connector.
(In case of check by pulling out the float switch
connector, be sure to return the connector to the
original position.)
CN34
(RED)
– 106 –
Drain pan
downwards.
polyvinyl chloride container
Vessel
Water (1500 to 2000 cc)
 Perform heat insulating
• As shown in the figure, cover the flexible hose and
hose band with the attached heat insulator up to the
bottom of the indoor unit without gap.
• Cover the drain pipe seamlessly with a heat insulator
to be procured locally so that it overlaps with the
attached heat insulator of the drain connecting
section.
220 - 240 V, 50 Hz
208 - 230 V, 60 Hz
• Direct the slits and seams of the heat insulator
Power
upward to avoid water leakage.
terminals
L
N
White
Red
Black
Pull out connector CN34 (Red)
from P.C. board.
Black
Power supply wiring
Float switch
connector (3P)
(CN34: red)
Wrap the attached heat insulator seamlessly from
the surface of the indoor unit.
Heat insulator
Heat insulator of the
(Locally procured)
drain connecting
section (Accessory)
212-EN