to 235 V with the hoist operating at full load.
- The electrical supply line must be fitted with both overcurrent
and differential type protection devices and the earth wire must
have the same cross-section as the live wire. The wires must be
sized taking into account the operating currents and the length of
the line to avoid excessive voltage drops (see Table 1).
Do not use extension leads wound onto drums.
- The power supply cable must be suitable for frequent handling
and must have an abrasion-resistant sleeve (e.g. H07RN-F).
- Connect the machine s plug to a 16 Amp EEC socket with an
IP67 protection factor and tighten up the securing collar.
- The hoist is now ready for testing.
5. TESTING
- Warning!! Testing must be carried out by
qualified personnel only. Take all necessary safety
precautions.
- Warning: the hoist must be tested before use.
Before testing the hoist make sure that it has been correctly
installed.
1) Lower the unloaded rope to the lower loading position by
pressing the down button, and check that at the end of its
travel three turns of rope remain on the drum.
2) No-load test. Apply a small load (20 kg) and check that the
machine works correctly by running a complete up/down cycle.
Test the up, down and emergency stop buttons and check that
the up limit switch and the electric motor brake work correctly
and that the cable winds correctly onto the drum.
3) Load test. Load the hoist with the maximum allowable load.
Run a complete up/down cycle to test the stability of the supports
and the motor brake.
After the test, check the support structure for failure and
slippage and recheck the horizontal alignment of the drum (using
a level as shown in fig. 1).
4) The hoist is fitted with a safety which stops travel at the UP (9) and
fully unwound positions (17) to avoid the rope winding on in the
wrong direction.
Do not depend on this safety to stop the winch; release the control
button to stop the winch instead.
- IMPORTANT! Limit switch activation can occur either
due to incorrect working height or due to other problems
which may prejudice correct hoist functioning. After the limit
switch has been activated, the hoist installation and
components must be checked (rope, drum, shaft etc.)
When testing is completed, fill in the test report with the date,
installation check and signature (Table 2) along with any other
comments.
- The test procedure described above, complete
with no-load (2) and load (3) tests, must be performed
every time the machine is installed.
6. SAFETY WARNINGS AND OPERATING PRECAUTIONS
- 1) Never lift loads exceeding the capacity of the
elevator.
- 2) Never allow persons to remain below suspended
loads.
- 3) Never try to lift loads anchored to the ground
(e.g. embedded posts, plinths, etch.).
- 4) Ensure that the load is securely connected to
the elevator hook and also close the safety catch (ref.6
fig. 4.1).
- 5) If the load requires accessories to be attached
to be hooked up, these must be certified and approved
(harnesses, ropes, slings, etc.). The weight of these
accessories must be subtracted from the maximum
capacity.
- 6) Ensure that no part of the load protrudes during
the lifting phases.
- 7) Before releasing the load, ensure that it is in a
stable position.
IMER INTERNATIONAL S.p.A.
TR 225 N
cause sudden release or by cutting the slings, causing a
backlash movement of the entire structure.
drum during operation, as this constitutes a risk of
entrapment in the ropes unwinding, with the risk of
serious accidents.
counterweight during the ascent phase, as this constitutes a
risk of crushing on contact with the limit switch lever.
(strong winds or storms) as the load is not guided.
must ensure perfect visibility of the load throughout
travel.
fitted.
correctly, turn on turn, without slackening or twisting,
which can cause damage to the rope. If this occurs,
unwind the rope and rewind correctly keeping the rope
tensioned at all times.
obstacles throughout the height and take necessary
precautions to prevent persons from leaning out of
intermediate floors.
from being present during lifting.
elevator.
unauthorised personnel access or operation.
strictly prohibited (over 5° with respect to vertical angle).
the pendant control; it must always be rotated manually
from the frame.
Raise or lower it and unload it.
load to turn as this may cause the rope to break.
the load, wind the rope completely onto the drum, and
detach the power plug from the mains.
must be done in such a way as to minimise dangerous
sideways and vertical movements.
When operation is resumed after an extended period of disuse
(e.g. overnight) the entire machine must be tested under no-load
conditions before starting (as described in section 5, point 2).

7. CHECKS AND MAINTENANCE

out with the machine switched off, unloaded and
disconnected from the mains.
- Repairs must be made by qualified personnel or by the IMER
technical service.
- Use only IMER original spares.
machine remain legible.
start of every work shift.
12
- 8) A suspended load must never be detached to
- 9) Never move hands or parts of the body near the
- 10) Never move hands or parts of the body near the
- 11) Avoid use in adverse weather conditions
- 12) The control position and lighting conditions
- 13) Ensure that all guards and safety devices are
- 14) During use, check that the rope unwinds
- 15) Ensure that the travel and work area is free of
- 16) Delimit the lower load area to prevent persons
- 17) Keep children at a safe distance from the
- 18) When the elevator is not in use, do not allow
- 19) Use of the elevator for oblique tractions is
- 20) Never rotate the elevator on the pins by pulling
- 21) Do not leave a suspended load unattended.
- 22) During lifting or lowering, never allow the
- 23) Before leaving the elevator unattended, remove
- 24) When a load is to be raised or lowered, this
- Warning! All maintenance work must be carried
- Check the motor brake every 6-7 days.
- Make sure that the notices and inscriptions on the
- Keep the machine clean of dirt.
- Check operation of the UP limit switches at the