Herunterladen Inhalt Inhalt Diese Seite drucken

YATO YT-82223 Originalanleitung Seite 12

Multifunktionales oszillationswerkzeug
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 14
GB
Attention! It is possible to install the inserted tools with open or closed mount.
The lever of mechanism for rapid installation is equipped with protection, which protects the operator's fi ngers against being
trapped by the descending lever. Before you completely lower the lever you should move the protection to the position which is
enabling to close the lever (IV).
Turn the lever of the quick installation mechanisms for 180 degrees, allowing the inserted tool to be mounted int spindle handle.
Push the lever of the quick installation, so as to protect it from accidental opening during its operation (IV).
Attention! Adapter for grinding may be provided with a pad located in the mounting hole, before mounting adapter for grinding, the
pad should be removed from the opening, for example by a small screwdriver.
Mounting the abrasive sheet (V)
When you select as an inserted tool the adapter for grinding, before starting the work you need to install on it sanding sheet. The is
equipped with a velcro pad, to which the sanding sheet should be attached in such a way so the edges of the sheet would covered
with the adapter edges. For adapters which are equipped with holes for dust extraction, you should apply sanding sheets with
holes. While attaching the sheet to adapter, you should ensure that the holes in sheet would cover the holes in adapter.
Dust extraction (VII)
The tool is equipped with the attached dust extraction system. Dust extraction fulfi lls its role only in the case of work performed
with the grinding adapter. The dust extraction should be installed before installing the grinding adapter. The front part of the ex-
haust should be translated through the spindle so, the catches would be blocked on the protrusions of tool housing. The rear part
of the dust extraction should be secured with clamp engaging at the bottom row of the rear air vents.
Dust extraction outlet should be connected to an external dust extraction system. In the case of using an external installation of
dust extraction you should follow the instructions supplied with these installations.
Installation of the auxiliary handle (VIII)
The tool enables for a two-handed grip, even without mounted auxiliary handle, but where the handle will not interfere with the
work, eg. due to lack of space, it should be installed by fi rm screwing to the hole in the housing on the left or right side.
PREPARATION FOR WORK
Remove the plug of the power supply cable from the socket.
Before any work with the tool, it is required to make sure the housing and the connection cord with plug are not damaged. In case
any damage is detected, it is prohibited to connect the tool to the mains!
Insert the insertion tool designed for the given kind of work.
Wear eye and hearing protectors and working gloves.
Make sure the switch is „OFF", and then insert the plug of the power supply cable to the mains socket.
Adopt an adequate position, which guarantees stability during work and turn the tool on using the switch.
USING THE TOOL
Commence work applying the insertion tool to the material to be processed. During work do not exert excessive pressure against the
material being processed and do not make sudden movements, so as to avoid any damage to the insertion tool or the abrasive sheet.
Due to the level of vibration noise and dust generated by the tool, it is necessary to make regular breaks during work. Avoid over-
loading the tool, the temperature of the external surfaces at any time must not exceed 60°C.
Always use individual protection means: working gloves, safety goggles and hearing protection.
Remove accumulated dust from the abrasive sheet from time to time. In order to do so turn the tool off and slightly tap the foot of
the grinder. Do not process diff erent materials using the same abrasive sheet!
Once the work has concluded turn the tool off , remove the plug of the power supply cable from the mains socket and realise
maintenance and inspection of the tool.
The declared total value of vibration has been measured through a standard measurement method and may be used to compare
diff erent tools. The declared total value of vibration may be used for the purpose of preliminary evaluation of exposure.
Attention! The actual vibration while operating the tool may vary from the declared value, depending on the use of the tool.
Attention! It is required to specify the safety measures to protect the operator, which are based upon the evaluation of exposure
under actual conditions of work (including all the stages of the working cycle, e.g. the periods when the tool is off or is idling and
the periods of active operation).
MAINTENANCE AND OVERHAUL
ATTENTION! Before any adjustment, technical service or maintenance operations unplug the tool. Once the operations have been
fi nished, the technical conditions of the tool must be assessed by means of external evaluation and inspection of the following
elements: body and handle, conductor with a plug and defl ection, functioning of the electric switch, patency of ventilation slots,
sparking of brushes, noise level of functioning of bearings and gears, start-up and smoothness of operation. During the guarantee
O R I G I N A L
I N S T R U C T I O N S
12

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis