Herunterladen Inhalt Inhalt Diese Seite drucken

Dantherm CDT 30S MKII Serviceanleitung Seite 8

Vorschau ausblenden Andere Handbücher für CDT 30S MKII:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 107
Preparation and transportation guide,
Position
Optimum operation Ensure the room to be dehumidified is sealed, and that the machine is not located near
Electrical connection The machine comes complete with a 3.5m power cord, and can be connected to any 230
Stairs
Transporting or
moving the dehu-
midifier
6
All manuals and user guides at all-guides.com
Position the dehumidifier where there is plenty of air circulation around it, with mini-
mum 60 cm of clearance on the air intake side, and 3 meters of clearance on the ex-
haust side if no flexible ducts are attached.
a heat source, such as radiators.
If flexible ducts are attached, performance will be significantly impaired if they exceed 5
metres in length.
V, 50 Hz socket with a 10-16A fuse.
The wheels are positioned such that the machine can be pulled upstairs without damage
to the cabinet or stairs.
The machine can be moved by two people or using a crane. See the instructions below:
Be aware of any local safety regulations with regard to lifting!
cont.
2 people
Hoist/crane
Lifting using a cargo strap
Continued on next page

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cdt 40s mkii

Inhaltsverzeichnis