Herunterladen Inhalt Inhalt Diese Seite drucken

Transport, Storage And Packaging; Installation And Wiring - Kampmann AC Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
2.3
Risk from electrocution!
DANGER!
Risk of fatal injury from electrocution!
Contact with live parts will lead to fatal injury from electrocution. Damage to the
insulation or individual components can lead to a fatal injury.
Only permit qualified electricians to work on the electrical system.
Immediately disconnect the system from the power supply and repair it in
the event of damage to the insulation.
Keep live parts away from moisture. This can cause a short circuit.
Properly earth the unit.
First switch off the main switch, then disconnect the plug before working
on the unit.
2.4
Personnel requirements - Qualifications
Expertise
The installation of this product requires specialist knowledge of heating, cooling, ventilation, in-
stallation and electrical engineering.
Damage caused by improper installation is the responsibility of the operator or installer. The in-
staller of these units should have adequate knowledge of the following gained from specialist
professional training
Safety and accident prevention regulations
Country-specific guidelines and recognised technical regulations, i.e. Association of German
Electricians (VDE) regulations, DIN and EN standards.
VDI 6022; maintenance personnel must be trained to Category B (possibly Category C) to
comply with hygiene requirements (as required).
2.5
Personal Protective Equipment
Personal protective equipment is used to protect people from impaired safety and health when
working with the unit. The applicable accident prevention regulations at the place of use apply
in all cases.
3

Transport, storage and packaging

3.1
General transport instructions
Check on delivery for completeness and transport damage.
Proceed as follows in the event of visible damage:
Do not accept delivery or only accept with reservations.
Record any transport damage on the transportation documents or on the transport company's
delivery note.
Submit a complaint to the freight forwarder.
IMPORTANT NOTE!
Warranty claims can only be made within the applicable period for complaints.
(More information is available in the T&Cs on the Kampmann website)
IMPORTANT NOTE!
2 people are needed to transport the unit. Wear personal protective clothing
when transporting the unit. Only lift the unit on both sides and not by the pipes /
valves.
IMPORTANT NOTE!
Material damage caused by incorrect transport!
Units being transported can drop or topple over if transported wrongly. This can
cause serious material damage.
Proceed carefully when unloading the equipment on delivery and when
transporting it on site and note the symbols and instructions on the pack-
aging.
Only use the holding points provided.
Only remove packaging shortly before assembling the unit.
4

Installation and wiring

4.1
Requirements governing the installation site
Only install and assemble the unit if the following conditions are met:
Make sure that the wall/ceiling is sufficiently load-bearing to take the weight of the unit.
Make sure that the unit is securely suspended/standing.
Ensure that the airflow can circulate freely.
Provide for adequate space for floor and return water connections on site.
There is a power supply on site.
Elektroanschluss bei Ausführung EC,
elektromechanisch
4.2
Minimum clearances
Elektroanschluss bei Ausführung EC
AC site heaters can be installed free-standing or suspended from the wall using the wall brack-
mit KaControl
ets supplied or suspended from the ceiling using the ceiling brackets supplied. Installation using
existing wall or ceiling brackets is also possible.
A minimum distance L in accordance with the table below must be respected between the suc-
tion zone of the unit and the wall/ceiling! Non-observance of this minimum distance will reduce
the output of the site heater and increase the noise level.
Be sure to observe the minimum distances when using accessories or for maintenance purposes!
Minimum distances, site heater
Series
Type
4
54_31
5
55_31
6
56_31
7
57_31
4.3
Installation
2 people are needed to install the unit.
CAUTION!
Risk of injury from sharp metal housing!
The inner metal of the casing can have sharp edges.
Wear suitable protective gloves.
IMPORTANT NOTE!
Horizontal installation of units!
When installing the units, ensure that they are completely horizontal to ensure
proper operation.
IMPORTANT NOTE!
Install connections in the de-energised state!
Connections must be installed without tension!
Use a suitable tool to protect terminal nuts from being sheared off and
twisted.
22
Bauheizer AC
Assembly instructions
Minimum distance L min
160 mm
180 mm
230 mm
300 mm
5

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ec

Inhaltsverzeichnis