Herunterladen Inhalt Inhalt Diese Seite drucken

TEUFELBERGER treeMOTION essential Gebrauchsanleitung Seite 10

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18
Use
2.5. ADJUSTMENT OF BUCKLES
The default configuration is one knotted rope bridge,
with a ring disposed on it.
However, this manual describes all acceptable
configurations:
- one bridge with one ring
- two independently knotted bridges, each with one
ring
- two bridges knotted on top of one another, each with
one ring
Instead of the ring, you can also use hardware
according to:
- PPE treeMOTION Open Ring bk 7350351
- EN 362 (karabiners for climbing)
- ANSI/ASSE Z359.12 (karabiners certified only by UL)
Pre-installed
rope bridge
Additional
rope bridge
10
Adjust the length of the rope bridges supporting
the rope bridge attachment point ensuring the
stopper knots are properly tied, dressed and set
before going 'on rope'.
The climber shall fully equip the harness for the
task to be performed, then hang in suspension and
adopt a range of work positions to ensure that the
harness is properly fitted, comfortable and suitable
for the task.
Leg and back paddings are attached to the harness
by hook-and-loop fastener and can be removed for
cleaning and put back in place.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Treemotion pro

Inhaltsverzeichnis