Herunterladen Inhalt Inhalt Diese Seite drucken

Hydraulic - probst AKZ-UNI Betriebsanleitung

Aufbaukranzange
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Maintenance and care
6.1.2

Hydraulic

Service interval
First inspection after
25 operating hours
All 50 operating hours
5610XXXX-YYYY
Maintenance work
Control and tighten all hydraulic thread joints and connection.
(The implementation is only allowed by an expert).
Tighten all hydraulic connections.
Check the hydraulic system for leaks.
Check the hydraulic oil filter, clean it if necessary (if available).
Check the hydraulic oil and replace it in accordance to the manufacturer information
(recommended hydraulic oil: HLP 46 according to DIN 51524 – 51535).
Check the hydraulic hoses for breaks and abrasion.
Damaged hydraulic hoses must be replaced
(generally it is recommended to replace hydraulic hoses every 6 years).
Only specified types of oil may be used!
22 / 26
GB

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis