Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection - Ssp Holdx Rl2 Betriebsanleitung

Magnetische prozesszuhaltung
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

10 . Electrical connection

Note:
The illustrated examples are only suggestions. The user has the responsibility to
design the overall system in compliance with applicable rules and regulations.
Fig. 20: Connection example 1
Series connection HOLDX master and HOLDX slave.
The Termination Plug R120 is connected to the slave's X2 connection. The safety outputs Pin 2 (X1) and Pin 4 (X1) of the HOLDX master are connected to the safety relay S2 series. Setting
3 was defined on the safety relay (without cross-circuit monitoring, with the synchronous time of the sensor channels <5s). The connector Serial OUT of the HOLDX master Pin 7 (X1) and
Pin 8 (X1) and Serial IN Pin 5 (X1) and the connector Pin 6 (X1) are connected to a PLC.
EN
X2
1
3
Safety inputs
Safety outputs
X1
1
3
X2
1
3
Safety inputs
Safety outputs
X1
1
3
1
3
F1
+24 V
F2
A 1
S 11
mode
b)
1
e)
d)
A 2
Safety relay series S2
0 V
HOLDX R Termination Plug
120 R
2
4
5
6
2
4
5
6
2
4
5
6
CAN
Serial IN
2
4
5
6
2
4
5
6
Output
Standard-PLC
L1
H2
K A
R
K
B
S 21
S 22
S 12
X 2
X 3
13
23
33
41
a)
K1
K A
c)
K B
K2
K1
K2
14
24
34 42
K A
K B
N
SP-X-71-002-06
7
8
Slave
HOLDX RL2-CC-S
CAN
Error
Lock
Gate
7
8
7
8
Master
HOLDX RL2-CS-P8-...-B
Serial OUT
Error
Lock
Gate
7
8
7
8
Input
a) safety inputs
b) clock output
c) CPU
d) power supply
e) rotary knob for programming
41
Inhaltsverzeichnis
loading

Inhaltsverzeichnis