Herunterladen Inhalt Inhalt Diese Seite drucken

Installation On Swing Doors; Installation On Sliding Doors - Ssp Holdx Rl2 Betriebsanleitung

Magnetische prozesszuhaltung
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

3 .5 Installation on swing doors

Fig. 4: Attach the process lock to the profi le at the desired
height and tighten the Torx screws M6 x 25 mm.

3 .6 Installation on sliding doors

Fig. 7: Attach the process lock to the mounting plate and
tighten the Torx screws M6 x 25 mm.
All screws used are Torx pan-head screws with countersunk pin (safety screws) of strength class A2/70 and are tightened to 6 Nm. Securing from loosening with a medium-strength
threadlocker, e.g. Loctite 243.
See Section 11.1 for screws and mounting plate as additional equipment
EN
Fig. 5: Attach the anchor plate to the mounting plate and
tighten the Torx screws M6 x 8 mm.
Fig. 8: Attach the mounting plate with the process lock
to the profi le and tighten the Torx screws M8 x 12 mm.
Fig. 6: Attach the mounting plate with the anchor plate to
the profi le and align with the process lock. Tighten the Torx
screws M8 x 12 mm.
Fig. 9: Attach the anchor plate to the profi le of the sliding
door and align it with the process lock. Tighten the Torx
screws M6 x 10 mm.
29
Inhaltsverzeichnis
loading

Inhaltsverzeichnis