Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting Control Voltage Cables - Vetus BOW PRO B Thruster Serie Einbauanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33
To allow the bow thruster or stern thruster to be distinguished
on the CAN bus, these must be configured appropriately .
Bow thruster
The configuration as supplied is for application as a bow thruster.
Stern thruster
Configure a stern thruster by putting the switch on the inside of the
cover into the correct position.
• Reinstall the cover and tighten the glands.
Main power fuse 2
In the connection unit, there
is a main power fuse on the
controller.
This fuse protects the con-
troller and motor against
short
circuit/overloading
and it must remain present
under all circumstances .
When replacing the fuse, the replacement must be of the
same rating .
5 .6

Connecting control voltage cables

• Mount the control panel
at the helm position.
There must be 150 mm
of free space behind the
panel.
28
020809.04
n
ote
n
ote
- BPPJA
- BPPPA
vetus® Installation instructions BOW PRO Series Thrusters: BOWB150 - BOWB180 - BOWB210
• Connect the panel as shown in the diagram.
See diagrams on page
143
ed.
• Connect the CAN-bus supply to a 12-Volt power supply.
Terminator
Connection box thruster
Connection cable
24 V / 48V
+
12 V
Control voltage fuse
The CAN bus supply must always be connect-
n
ote
ed to 12 volts .
8
+
12 V
5
+
12 V
5
The CAN bus is a chain to which the bow thruster and the panels are
connected.
At one end of the chain, the power supply (5) must be connected
and the terminator (8) must be connected at the other end!
if several panels have to be connect-
Control panel
Connection cable
CAN-bus supply
M
8
M
n
ote

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bowb150Bowb180Bowb210

Inhaltsverzeichnis