Herunterladen Inhalt Inhalt Diese Seite drucken

Kampmann Katherm ID Montageanleitung Seite 6

Vorschau ausblenden Andere Handbücher für Katherm ID:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Katherm ID
Assembly instructions
5
Pre-commissioning checks
Before initial commissioning, check whether all the necessary conditions have been met so that
the unit can function safely and properly.
Water-side checks
Check whether all supply and drainage lines have been properly connected.
Fill pipes and unit with water and bleed.
Check whether all bleed screws are closed.
Check leak tightness (pressure test and visual inspection).
Check whether the parts carrying water have been flushed through.
Check whether any shut-off valves fitted on site are open.
Check whether any electrically actuated shut-off valves have been properly connected.
Check whether all valves and actuators are working properly (note permitted mounting pos-
ition).
Check whether primary air is correctly connected to the unit.
Check whether the pressure losses measured on the air side match the volumetric flows re-
quired.
6

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis