Herunterladen Inhalt Inhalt Diese Seite drucken

AFRISO FloCo-Top-1C Betriebsanleitung Seite 46

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
5.4
Mounting the suction line
LEAKING PRODUCT
Verify that you use a screwed pipe connection as per DIN 2353 with cylin-
drical thread (G thread) and seal the screwed pipe connection with a flat
gasket or with suitable glue. Do not use Teflon tape or hemp.
Failure to follow these instructions can result in equipment damage.
A
FloCo-Top-1C
1. Mount the suction line into the female thread G
cylindrical screwed pipe connection G
torque is 40 ±10 Nm.
2. Use a stiffener in the case of soft or semi-soft copper pipes.
3. Lock with an open ended spanner (spanner size 22) and tighten the
screwed connection at the connection piece.
4. Mount the burner hoses. Before mounting, make sure the sealing sur-
faces are clean and not damaged. The tightening torque is 20 ±5 Nm.
Mounting
NOTICE
3
/
A. Connection socket G
female for suction line
3
of the housing with a
/
8
as per DIN 2353. The tightening
8
FloCo-Top-C
EN
3
/
8
15

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Floco-top-2cFloco-top-1c siFloco-top-2cm siFloco-top-2cm optimum mc-18Floco-top-2cm ms-5Floco-top-1c serie ... Alle anzeigen

Inhaltsverzeichnis