Herunterladen Diese Seite drucken

Assembly; Before Starting - EINHELL BG-CB 2041 T Originalbetriebsanleitung

Benzin-multifunktionswerkzeug motorsense
Vorschau ausblenden Andere Handbücher für BG-CB 2041 T:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7

5. Assembly

5.1 Mounting the blade guard hood
Important: The cutting blade guard hood must be
fi tted if you wish to work with the cutting blade.
The guard hood for the cutting blade must be ins-
talled as shown in Figures 10-11.
5.2 Joining the drive rod mechanism to the
connecting piece (Fig. 4-7)
Open the handle screw (Item G) and push the
drive rod mechanism (Item 4) into the connecting
piece (Item 5). Make sure that the centering lever
(Item R) latches in the guide hole (Item H). Close
the guard cap (Item N) and tighten the handle
screw. To take apart, undo the handle screw and
open the guard cap. Press the centering lever and
simultaneously pull the drive rod mechanism out
of the connecting piece.
5.3 Fitting / Replacing the cutting blade
The procedure for fi tting the cutting blade is
shown in Figures 12-18. To dismantle, proceed in
reverse order.
Fit the carrier plate 30) onto the spline shaft
(Fig. 13)
Secure the cutting blade (1) on the carrier
plate (Fig. 14)
Place the pressure plate (31) over the thread
of the spline shaft (Fig. 15)
Plug on the cover of the pressure plate (32)
(Fig. 16)
Look for the hole in the carrier plate, line up
with the notch underneath and lock with the
supplied Allen key (22) in order to now tighten
the nut (24) (Fig. 17/18) Important: Left-hand
thread
5.4 Fitting the cutting line guard hood to the
blade guard hood
Important: The cutting line guard hood must be
fi tted in addition if you want to work with the cut-
ting line.
The procedure for fi tting the guard hood for the
cutting line is shown in Figures 19-20. A blade
(Fig. 19/ Item F) on the underside of the guard
hood automatically cuts the cutting line to the
optimum length. It is covered by a guard (Fig.
19/Item G). Remove the guard before you start
working and replace it when you have fi nished
working.
5.5 Fitting the additional handle
Fit the additional handle as shown in Fig. 8-9.
Anleitung_BG_CB_2041_T_BS_SPK7.indb 24
Anleitung_BG_CB_2041_T_BS_SPK7.indb 24
All manuals and user guides at all-guides.com
GB
5.6 Fitting / Replacing the line spool
The procedure for fi tting the line spool is shown in
Figure 21. To dismantle, proceed in reverse order.
Look for the hole in the carrier plate, line up with
the notch underneath and lock with the supplied
Allen key (22) in order to now screw the line spool
onto the thread. Important: Left-hand thread

6. Before starting

Each time before use, check the following:
That there are no leaks in the fuel system.
That the equipment is in perfect condition and
that the safety devices and cutting devices
are complete.
That all screws are securely fastened.
That all moving parts move smoothly.
6.1 Fuel and oil
Recommended fuels
Use only a mixture of unleaded petrol and special
2-stroke engine oil. Mix the fuel mixture as indica-
ted in the fuel mixing table.
Important: Do not use a fuel mixture which has
been stored for longer than 90 days. Important:
Never use 2-stroke oil with a recommended mi-
xing ratio of 100:1. The manufacturer's warranty
will be voided in case of engine damage due to
inadequate lubrication. Important: Only use con-
tainers designed and approved for the purpose to
transport and store fuel.
Pour the correct quantities of petrol and 2-stroke
oil into the mixing bottle (see scale printed on the
bottle). Then shake the bottle well.
6.2 Fuel mixing table
Mixing procedure: 40 parts petrol to 1 part oil
Petrol
1 liter
5 liters
- 24 -
2-stroke oil
25 ml
125 ml
01.12.11 10:37
01.12.11 10:37

Werbung

loading

Diese Anleitung auch für:

45.016.50