Setting up the heat pump

Installing the heat pump at its setup location
1. Place the heat pump on the ground anchors at the prepared setup location.
Take care to align the connections and the display in the intended direction.
2. Screw the feet of the heat pump hand-tight to the ground anchors.
The heat pump is installed at the setup location.

Connecting the lines/pipes

Connecting the water pipes
1. Clean large-particle soiling from the connection points of the heat pump
hose ends of the water pipes.
2. Screw the drain pipe onto the outlet water connection
3. Screw the supply pipe onto the inlet water connection
The water pipes are connected.
Establishing the power supply
1. Connect the power plug at the end of the power cable
location.
All display elements of the display
The power supply is established.
Connecting a drain pipe for condensation water (optional)
1. Insert the drain connection piece
2. Attach the drain pipe (garden hose) for condensation water to the drain connection piece
The drain pipe for condensation water is connected.
38
.
6
.
8
to the power supply prepared at the setup
9
light up.
C
into the hole in the base plate.
5
and the adapters on the
1
.
5