Installation
Fig. 14 Transport safeguard: Roller
Note: Figure shows DTL.
Fig. 15 Transport safeguard: NIP roller and VCT bar right
Fig. 16 Transport safeguard: Swivel table left
42
Cut open and remove the cable tie securing the
transport roller (Fig. 14/1).
In addition for a semi-automatic device: Cut open
and remove the cable tie securing the gate.
Cut open and remove the cable ties for NIP roller
(Fig. 15/1) and VCT bar (Fig. 15/2).
On the left side:
Loosen the four screws from the bracket and
remove the bracket (Fig. 16/1).