49) Z-Fold the canopy into the inner container.
50) Close the flap with the bungee loop and the two adjacent
flaps.
51) Start to S-coil the lines.
52) The loops of the coiled lines are secured in two groups with
rubber bands.
QUATRO
User manual / Handbuch / Navod k obsluze
53) Do not S-coil the last 1.2 m to 1.5 m of the lines.
54) Stow the S-coiled part of the lines into the front on the inner
container.
24