Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Controller; Checking The Scope Of Delivery - Vaillant VAZ CPC Installationsanleitung

Vorschau ausblenden Andere Handbücher für VAZ CPC:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
4 Set-up
Information on the
identification plate
1/N, 220-240 V,
50 Hz
... W
IPX4
Serial number
3.3 CE label
The CE label shows that the products
comply with the basic requirements of the
applicable directives as stated on the iden-
tification plate.
The declaration of conformity can be
viewed at the manufacturer's site.
4 Set-up

4.1 Checking the scope of delivery

Check that the scope of delivery is com-
plete.
Quant-
Contents
ity
1
VAZ CPC/CPCW control
1
Operating instructions
1
Installation instructions
78
Meaning
Permissible mains
voltage and mains
frequency
Effective power
IP level of protection
The 7th to 16th digits
of the serial number
form the article num-
ber

4.2 Installing the controller

1. Cut out an opening for the cables at
the point provided for this (2) in the wall
base.
Applicability: VAZ CPCW
When setting up the wireless con-
trol, ensure that the clearance to the
MASTER ventilation unit is ≤ 20 m.
2. Guide the cables through the opening.
3. Hold the wall base horizontally against
the wall and mark the positions of the
drill holes through the openings for the
screws (1).
4. Remove the wall base and drill the two
holes at the positions marked on the
wall.
5. Guide the cables through the opening
in the wall base.
6. Use suitable rawl plugs and flat-head
screws to secure the wall base in
place.
7. Connect the control to the electricity
supply. (→ Page 79)
8. Fit the control onto the wall base, un-
til the latching lugs audibly click into
place.
Installation instructions 0020237952_00
2
1

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vaz cpcw00202363670020236368

Inhaltsverzeichnis