Herunterladen Inhalt Inhalt Diese Seite drucken

Lonworks Interface - Nicotra Gebhardt EKE05-00 Serie Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.2 LONWORKS
Note
For all actions regarding the L
manual of your L
L
W
ON
3.2.1 Set the EC-Controller into Operation
Step
1
Connect motor cable
2
Connect mains
3
Connect Communication
Interface to the Nicotra Gebhardt
FFU Control network or to a
suitable L
W
ON
service tool
In case of using the Nicotra Gebhardt FFU Control Server please see the concerning
documentation for further commissioning steps.
®
4
Set the LON
"Configured online" state
5
Set nviMinSpeed,
nviMaxSpeed to the desired
values (in rpm units)
6
Set nviSpeed to the desired
speed value (in rpm units)
7
Set nviEnable to "4"
Note
All parameters including nviSpeed and nviEnable remain stored even if
mains is removed.
In case of power supply fail followed by return of mains voltage, the motor will
start and speed up to the last set value without the need to communicate with
the host or a comparable L
Commissioning
®
Interface
W
ON
ORKS
®
technology literature.
ORKS
Action
®
network
ORKS
node into
®
W
technology please see also the
ON
ORKS
®
network service tool and if necessary related
Condition
Mains not connected
Motor is already
connected
only necessary if the
node is at unconfigured
state (yellow LED
flashing)
®
W
network tool.
ON
ORKS
Expected Reaction
Green Ready-LED will
start flashing
Yellow LED will stop
flashing
LON® Node gets a
Subnet- and Node-ID
(=Address)
Motor will start and
speed up to the set
value
If the speed value is
higher than
nviMaxSpeed, motor
speed will be limited
EN-17 of 38

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für Nicotra Gebhardt EKE05-00 Serie

Diese Anleitung auch für:

Eke 05-0018-5e-ixEke 05-0040-5e-ix

Inhaltsverzeichnis