Herunterladen Inhalt Inhalt Diese Seite drucken

Intended Users - Frontiermedical toto Gebrauchsanweisung

System zur seitlichen umlagerung mit toto touch-steuereinheit
Vorschau ausblenden Andere Handbücher für toto:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 51
Patient Target Group
Immobile and less mobile patients who are at risk of developing pressure ulcers or injuries, who
require regular turning and those who may be non-compliant with manual turning schedules.

Intended Users

Intended for use in home and professional healthcare facilities by medically trained and untrained
users. There are no special skills required to operate or use Toto. More information can be found
online at https://www.frontier-group.co.uk.
Instructions for Use
Before use, please read the following instructions. Should you have any queries, please contact
Frontier Therapeutics Ltd. on +44 (0) 330 460 6030 or visit our website www.frontiergroup.co.uk.
Platform Installation and Operating Guide
To ensure the system is correctly installed and functions smoothly, follow this step-by-step guide.
1. Remove all items from packaging and inspect for damage.
2. Remove the mattress and place the rolled platform at the foot end of the bed, roll out until it is
fully extended and positioned centrally to the bed frame.
3. Ensure the air cells within the platform are secured in position via the popper fastenings by
unzipping the cover and visually inspecting.
4. If required, re-fit the cover and close the zip ensuring the air cell hoses are fed through the
opening at the foot end of the cover.
Please note: The platform cover should be free to move, allowing each side of the platform
unrestricted room to inflate.
5. Using the quick connectors, connect the air inflation hoses to the air cell hoses - 'Red to Red' -
ensuring the hoses are not twisted or kinked.
6. Check the CPR deflation valves are securely in place to ensure no air leaks.
7. Replace the mattress on top of the platform. DO NOT strap or fasten the mattress to the bed
frame.
8. Using the bed hooks, hang the control unit on the bed footboard.
9. Using the quick connectors, connect the air inflation hoses to the control unit - 'Black to Control
Unit' - ensuring the hoses are not twisted or kinked.
10. Connect the control unit to mains power via the lead supplied.
A. The platform should be placed directly
onto the bed frame and underneath the
existing mattress.
B. Inspect the platform for visible signs of
damage.
11
C. Using the quick connectors, connect
the air inflation hoses to the air cell hoses
- 'Red to Red' - ensuring the hoses are
not twisted or kinked.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis