Herunterladen Inhalt Inhalt Diese Seite drucken

Chapter 4: Power Supplies Connection; Parallel Operation; Parallel Connection - Tdk-Lambda Rfe2500 Serie Bedienungsanleitung

Inhaltsverzeichnis
CHAPTER 4:
4.1

Parallel Operation

RFE2500
+V
+SENSE
J1-2
-SENSE
J1-1
-V
ENABLE
J1-9
SIGNAL RETURN
J1-8
VOLTAGE PROG.
J1-3
TRIM J1-13
CURRENT PROG.
J1-4
+5V
J1-14
CURRENT SHARE J1-17
RFE2500
+V
+SENSE
J1-2
-SENSE
J1-1
-V
ENABLE
J1-9
SIGNAL RETURN
J1-8
VOLTAGE PROG.
J1-3
CURRENT PROG.
J1-4
+5V
J1-14
CURRENT SHARE J1-17
CURRENT SHARE J1-18
RFE2500
+V
+SENSE
J1-2
-SENSE
J1-1
-V
ENABLE
J1-9
SIGNAL RETURN
J1-8
V_PROG
J1-3
CURRENT PROG.
J1-4
+5V
J1-14
CURRENT SHARE J1-17
POWER SUPPLIES CONNECTION
Figure 4–1:
LOAD
+V
-V
Up to 8 x RFE2500 units with the same rating (voltage and
current) can be used in parallel to increase the output
current.
By connecting the CS signal between the paralleled units,
automatic current balance is achieved with accuracy of
Accuracy ±10%:
Accuracy ±5%:
Derate the total output current by 5% when using parallel
operation to prevent unit overload condition.
The built-in O-Ring MOSFETs on the main output and the
12V Auxiliary output allow N+1 operation.
If Voltage programming is used, "VOLTAGE PROG." pin of
all units must be connected in parallel.
Referenced to "SIGNAL RETURN" (floating from the
output) controls/signals and +12V AUX can be connected
in parallel.
ENABLE of all supplies can be connected to a single switch.
For PMBus option.
If voltage programming is done with PMBus, Voltage
Programming and V_REF of all units must be connected in
parallel.
Connect PMBus Signals in parallel (PMBUS is isolated from
output), and choose different address for each unit.
If Current Programming is done with PMBUS, Current
Programming and V_REF of all units must be connected
in parallel.

Parallel Connection

16
20% ≤ Iout < 80% of max Iout.
Up to 8 units
Iout ≥ 80% of max Iout.
Up to 8 units.
Inhaltsverzeichnis
loading

Inhaltsverzeichnis