Commissioning slaves
Later commissioning
IPE 030 - 033 CN 05
10. Completion of commissioning
Confirm overview with
After a master has been defined, the display for requesting the CAN-ID is automati-
cally shown on the display on each slave in a manual device search.
1. Request CAN ID (this step is only necessary for manual device searches)
Request the next higher free ID from the master with
ID with
.
The master assigns a free ID to the slave. Confirm the ID within 5 seconds with
.
Request further IDs with
Confirm the CAN ID with
NOTE
The data for the individual slaves can be assigned in the Schüco Browser and in the
menu of the main unit based on the IDs.
The CAN-ID 1 is automatically assigned to the master. This means the slaves can
be assigned IDs from 2 to 99.
Commissioning cannot be continued until after an ID has been requested from the
master.
2. Completion of commissioning
Confirm overview with
3. Commissioning of all other slaves as described above
If you add new units or replace existing ones in your solar system, then you can dis-
play the unit list in the display on the master under Settings - Network - CAN bus.
The new unit can then be put into operation in accordance with the description for
commissioning slaves.
NOTE
Configuration of grid security management
The inverter has grid management functions in accordance with the following guide-
lines:
x Technical directive "Power generating facilities using medium-voltage grids" from
the German Energy and Water Association (BDEW).
.
/
.
within 5 seconds.
.
Commissioning
or the next lower free