Herunterladen Inhalt Inhalt Diese Seite drucken

Schüco IPE 030 CN 05 Kurzanleitung Seite 77

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 8
5.2
Commissioning
Commissioning single unit
System with one inverter
IPE 030 - 033 CN 05
The commissioning menu comes up automatically when the Schüco inverter is con-
nected for the first time. It helps you make the standard settings.
NOTE
For a better understanding of keyboard operation, please also see the chapter Ope-
ration.
The procedure for commissioning the Schüco inverter as a
x single unit
x and as a master and slaves with several networked units
is described in detail below.
1. During initial start-up the following appears on the display. Start commissioning
with
.
2. To do this, select the language in selection menu with
Confirm the selected language with
3. Select the country in the selection menu with
4. Confirm the country of installation with
NOTE
The inverter only starts feeding current into the grid once the country has been se-
lected.
Commissioning
/
.
.
/
.
.
73

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ipe 033 cn 05

Inhaltsverzeichnis